To prove that a hydrogen project is fully renewable, suppliers must show that the renewable electricity used in RFNBO production is “additional renewable energy”, i.e. the electricity would not have been produced, or would have been wasted, if not consumed by the hydrogen production site. This will be the case if one of these criteria is satisfied:
(a) Direct line, no grid connection: The electricity production site is directly connected to the hydrogen production site with no connection to an electricity grid – i.e. a private wire connection
(b) Direct line, grid connection: The electricity production site is connected directly to the fuel production plant and the electricity grid, and the fuel production plant can evidence that their consumption has been provided by the electricity production site without importing electricity from the wider grid
(c) Additional capacity via an electricity grid: The electricity production site (or a proportion of it) was specifically built, upgraded, life-extended or brought back into service for the purposes of providing electricity via an electricity grid to a given hydrogen production site
(d) Curtailment and wastage: The renewable electricity used is electricity which would have led to curtailment or been wasted if not consumed by the hydrogen production site
(e) Other: The supplier can provide evidence relating to a case not specified above that satisfies the Administrator that the renewable electricity is additional
For cases (a) to (c), a supplier must demonstrate that the renewable electricity consumed is from new generation capacity at a new, upgraded, life-extended or recommissioned site which came online at the same time or after the hydrogen production site started operating, and (for life-extended sites) would have ceased being able to operate without investment as a result of demand from the hydrogen production site.
For cases (c) and (d):
- there must be temporal correlation between electricity generation and electricity consumption. For each settlement period (up to 30 minutes) it must be demonstrated that the amount of renewable electricity consumed by the hydrogen production site was not more than the renewable electricity supplied by the electricity production site(s) exclusively for use by the hydrogen production site. Energy storage such as batteries can be used to buffer the electricity supply
- there must be a renewable power purchase agreement (PPA), or equivalent contractual mechanism, in place between the electricity producer and the hydrogen producer for an amount of electricity equivalent to the amount that is claimed as additional renewable electricity. This can be either a direct/sleeved or a virtual PPA. Where the same legal entity operates both the electricity and hydrogen production sites a PPA is not required but equivalent documentation must be provided to demonstrate that the claimed renewable electricity was supplied to the grid exclusively for use by the hydrogen production site and was not consumed or sold for use elsewhere
- where RFNBOs are produced from additional renewable electricity supplied through the electricity grid in a country where a guarantees of origin (GOs) or equivalent system is in place, suppliers must be able to demonstrate evidence of the retirement of any and all certificates associated with the renewable electricity consumed
- suppliers must take into account grid technical losses when determining the amount of additional renewable electricity supplied. There is a formula for calculating this. They must also be able to demonstrate that there is no systematic grid congestion between the renewable electricity production site(s) and the hydrogen production site.
Where additionality is demonstrated for all of the electricity consumed and all of that electricity is derived from non-bioenergy renewable sources, the fuel can be considered to be 100% RFNBO.
If the criteria for additionality can only be met for a proportion of the electricity supplied, for example where an electricity production site provides insufficient electricity to the grid to meet the demand from the hydrogen production site, the RFNBO fuel should be divided into two consignments proportional to the amount of electricity supplied that meets the additionality criteria. The consignment derived from electricity which doesn’t meet the additionality criteria should revert to using grid average figures for determining renewability.